Concrete Calculator: Cubic Yards and Bags

Pick the shape, enter its size in feet and inches or metres, add a waste allowance, and see the volume and the number of pre-mix bags. After switching units, re-enter your measurements.

Updated

Embed this calculator

Paste this code into your page. The calculator runs inside the frame and links back to the full version.

Keep the credit link in place. Do not resell the calculator.

Formula

  • Box shapes (slab, footing, wall): volume (ft3) = length (ft) x width (ft) x thickness (in) / 12
  • Round column: volume (ft3) = pi / 4 x diameter (ft)^2 x height (ft)
  • order = volume x pieces x (1 + waste %), then cubic yards = ft3 / 27 and m3 = ft3 x 0.028316846592
  • bags = round up (order in ft3 / bag yield), with yields of 0.60 (80 lb), 0.45 (60 lb) and 0.30 (40 lb) cubic feet

Worked example

A 10 ft x 10 ft slab, 4 in thick, with 10% waste:

  1. 10 x 10 x 4 / 12 = 33.33 ft3
  2. x 1.10 = 36.67 ft3 = 1.36 yd3 (1.038 m3)
  3. 36.67 / 0.60 = 61.1, so 62 bags of 80 lb (82 of 60 lb, 123 of 40 lb)

Assumptions

  • Bag yields are typical label values; check the bag you buy.
  • Metric inputs are converted with exact factors (1 ft = 0.3048 m, 1 in = 2.54 cm).
  • A wall uses its height in the width field. A column ignores thickness.
  • Bag counts are always rounded up to whole bags.
  • Reinforcement, sub-base and formwork are not included.

Frequently asked questions

How do I calculate concrete for a slab?

Multiply length by width by thickness, all in feet, and divide by 27 for cubic yards. A 10 ft by 10 ft slab 4 in thick is 10 x 10 x (4 / 12) = 33.3 cubic feet, which is 1.23 cubic yards before waste.

How many bags of concrete do I need?

Divide the volume in cubic feet by the yield printed on the bag. An 80 lb bag yields about 0.60 cubic feet, so 36.7 cubic feet (the 10 x 10 ft slab with 10 percent extra) needs 36.7 / 0.60 = 61.1, so 62 bags. A 60 lb bag yields about 0.45 and a 40 lb bag about 0.30 cubic feet.

How much waste should I allow?

Ten percent is a common allowance for uneven sub-grade, spillage and over-excavation. Use 5 percent for a neat form on firm ground and 15 percent or more for rough ground. Ready-mix is usually ordered to the nearest quarter or half yard.

Should I buy bags or order ready-mix concrete?

Bags are practical up to about 1 cubic yard, which is roughly 45 bags of 80 lb. Above that, mixing by hand gets slow and the finish suffers if the pour pauses, so a ready-mix truck is usually better.

How do I work out a round column or pier?

Volume is pi / 4 x diameter squared x height. A column 2 ft across and 8 ft tall holds 3.1416 / 4 x 4 x 8 = 25.1 cubic feet, or 0.93 cubic yards before waste. Enter the diameter as the width and the height as the length.